- Projects
Palm Waste Fired Boiler Dust Collection System
- Client: Max Two Engineering & Services
- Year: 2019
- Application: Boiler Dust Collection
High-capacity dust collection system engineered for palm waste-fired boiler applications, handling heavy dust loads with optimized collection efficiency.
Technical Specifications
- Boiler Capacity: 40 TPH
- Gas Volume: 185,000 m³/hr
- Operating Temperature: 280°C
- Inlet Dust Load: 600 mg/Nm³
- Total Collection Area: 2016 m²
Performance
- Desired Emission: 150 mg/Nm³
- Achieved Emission: 43 mg/Nm³